07909901102 stuart@ssmithplastering.co.uk GALLERY - Making good.
An original cupboard was removed from the other un-seen side of this plasterboard wall and then the existing stud wall moved back into that room increasing the size of the room you see below. All the work up until this stage was done by the customer and we were just called in to plaster it, the walls and ceiling had to be primed and then levelled with a backing plaster before it could be skimmed and feathered into the existing plaster all around.
Stuart Smith  Plastering Services